PROJECTS
Pipeline
As Victoria’s population grows and the need for utilities rise, pipeline projects are an integral part of meeting those needs. Tardis Archaeology are experienced in balancing the needs of such development while managing the cultural heritage requirements and expectations of the Registered Aboriginal parties.
We have been involved in the following project:
- APA Gas Pipeline LV13-LV15 Yorta Yorta Longwood - Violet Town
- APA VNIE Loop 6 (Broadford to Mangalore Gas Pipeline)
- Basker Manta Gas Pipeline, Newmeralla
- Brooklyn - Altona Pipeline
- Bruces Track to Metung WWTP Transfer Pipeline
- Design & Construction of an Under Channel Main, San Remo
- Envestra Augmentation (RREA), Stage 3 of the Dandenong to Crib Point Pipeline
- Highett Gas Transmission Pipeline
- Korumburra Transfer Main Pipeline
- Lakes Entrance to Nowa Nowa Pipeline
- Lilydale Pipeline
- LV15-LV17 Pipeline Violet Town - Glenrowan
- Lyndhurst to Skye Pipeline Looping (Abbotts Road to Hall Road) (Northern Area)
- Proposed Brodribb Pipeline Route, East Gippsland
- Proposed Pipeline Route Between Sarsfield and Bruthen
- Proposed Pipeline Route Between Wy Yung and Barinsdale
- Recycle Water Pipeline Foster WWTP to Foster Golf Course & Showgrounds
- Recycled Water Pipeline between the Kilmore Water Treatment Plant and the Kilmore Racecourse
- Sanctuary Lakes Golf Course Re-Use Pipeline, Point Cook
- Sewer Pipeline Alignment, Tuckers Road, Clyde North
- Sewer Pump Station and Pipeline at 139 Princes Hwy, Lucknow
- Shaw River Power Station, Pipeline Alignment
- St Albans to Werribee Main Stage 2 (Wyndham Pipelines)
- Sunbury Pipeline
- Tarrone Gas Pipeline, Tarrone
- TGP Connection Pipeline, Longford (ESSO Pipeline)
- Venus Bay Outfall (VBO) Pipeline
- Warburton Pipeline
- Warragul Pipeline Duplication
- Wollert - Benalla Pipeline
- Wonthaggi Desalination Plant (Thiess), Transfer Pipeline & Power Utilities Corridor; and
- Wollert - Barnawartha Pipeline